tag:blogger.com,1999:blog-11432525.post112394431789785109..comments2023-10-16T03:27:54.609-07:00Comments on new A's ballpark: The Price of BARTMarine Layerhttp://www.blogger.com/profile/13515986023439927575noreply@blogger.comBlogger9125tag:blogger.com,1999:blog-11432525.post-1124147218189936902005-08-15T16:06:00.000-07:002005-08-15T16:06:00.000-07:00I made a couple of calls and fired off some e-mail...I made a couple of calls and fired off some e-mails to BART's planning department. I hope to get more information.<BR/><BR/>As for "connection to BART," I'll leave that to interpretation. I'll assume the worst (BART station), and hope for the best (a compromise plan). As I said on the scout.com message board, if I'm Wolff I'm saying, "I'm paying for the land, I'm building the ballpark and bringing developers to a blighted, underserved area, the least you (Oakland) can do is provide zoning and help with mass transit, and since BART already runs near the area, it makes sense to build a station there." Maybe there's some room for compromise, but I wouldn't assume that he'll budge on it. He'll be bringing in maybe 10,000 new residents. A BART station within walking distance (1/2 mile) is a major selling point for any new housing there.Marine Layerhttps://www.blogger.com/profile/13515986023439927575noreply@blogger.comtag:blogger.com,1999:blog-11432525.post-1124147150455578352005-08-15T16:05:00.000-07:002005-08-15T16:05:00.000-07:00This comment has been removed by a blog administrator.Marine Layerhttps://www.blogger.com/profile/13515986023439927575noreply@blogger.comtag:blogger.com,1999:blog-11432525.post-1124110071011567202005-08-15T05:47:00.000-07:002005-08-15T05:47:00.000-07:00Well notice how he said "connection to BART", not ...Well notice how he said "connection to BART", not "BART station". :)Anonymousnoreply@blogger.comtag:blogger.com,1999:blog-11432525.post-1124084055696308092005-08-14T22:34:00.000-07:002005-08-14T22:34:00.000-07:00The use of the word "preferred" is misleading. Tha...The use of the word "preferred" is misleading. That's probably Dickey's choice of words there when he wrote the article.<BR/><BR/>Dave Newhouse's column, on the other hand, does have a direct quote from Wolff, <BR/><BR/>"Aesthetically, a waterfront site would be my first choice."It would be great to be on the water for anything," Wolff said after the JPA presentation, having granted a private interview with this columnist. "But we must have a connection to BART and access — off-ramps."Marine Layerhttps://www.blogger.com/profile/13515986023439927575noreply@blogger.comtag:blogger.com,1999:blog-11432525.post-1124044792336131192005-08-14T11:39:00.000-07:002005-08-14T11:39:00.000-07:00Dave, could you please post a link to that quote? ...Dave, could you please post a link to that quote? I think it'd make a lot of people sleep easier (including me).<BR/><BR/>As for building a new platform, the tracks converge to run right next to each other a few blocks south of San Leandro and Seminary. The aerial is in a narrow strip of land, sandwiched between San Leandro and the railroad tracks. So to build the platform, additional land would have to be acquired (the tracks) and one or more aerial tracks may have to be rerouted. The alternative might be if there are two platforms on the outside of the tracks, but the southbound platform would have to be built <B>over</B> San Leandro St.Marine Layerhttps://www.blogger.com/profile/13515986023439927575noreply@blogger.comtag:blogger.com,1999:blog-11432525.post-1124005877422799872005-08-14T00:51:00.000-07:002005-08-14T00:51:00.000-07:00and where is that.....?and where is that.....?Anonymousnoreply@blogger.comtag:blogger.com,1999:blog-11432525.post-1124005450048425032005-08-14T00:44:00.000-07:002005-08-14T00:44:00.000-07:00I'm going to make some calls on Monday. One of the...I'm going to make some calls on Monday. One of them will be to BART media relations to see how they break down the costs. I drove by the likely site of the new BART station and tried to visualize it. I'm starting to see where the money might go.Marine Layerhttps://www.blogger.com/profile/13515986023439927575noreply@blogger.comtag:blogger.com,1999:blog-11432525.post-1124001067565737202005-08-13T23:31:00.000-07:002005-08-13T23:31:00.000-07:00And how is it that BART needs 10 new cars, when th...And how is it that BART needs 10 new cars, when they appear to be doing fine with the current cars? It's not like the A's are asking BART to expand all the way to San Rafeal or something, they're simply asking BART to make one extra stop in-between two stations which is doable because it is a pretty lengthy ride from Fruitvale to the Coliseum. Do you think BART's estimates are accurate? Because they based everything on that new station they just built.Anonymousnoreply@blogger.comtag:blogger.com,1999:blog-11432525.post-1123991024646616512005-08-13T20:43:00.000-07:002005-08-13T20:43:00.000-07:00Why does it cost so much to build a BART station? ...Why does it cost so much to build a BART station? I can understand if they were laying down new track, but, c'mon? How do a couple of turnstiles, escalators, and ticket machines add up to $70 million?Anonymousnoreply@blogger.com